Opuama Field Asset

PROJECT DETAILS

Opuama has been in production since 2014 and Gbetiokun started production in March 2019

 

The Opuama field production is transported from the Opuama Flowstation to Otumara via the OML 40 owned 36km export pipeline and injected via a LACT Unit at Otumara, then evacuated via the SPDC operated Trans Escravos pipeline to the Forcados Oil Terminal